Pile Cropping

Pile cropping is required when piles that have been over poured are ready to be trimmed to the required level ,first the pile is marked at the required level then the pile is saw cut all around 30mm deep after this our hydraulic pile cropper is placed around the pile just above the saw cut and hydraulic pressure applied to the cropper fracturing the pile above the saw cut the fractured part of the pile is then removed leaving the rebar intact ,the pile is the trimmed to the saw cut ,blinding is then poured below the saw cut leaving it ready for shuttering / steel fixers